
A building permit is required for accessory structures greater than 120 square feet, and for all accessory structures, regardless of size, that are located:
- In a proposed or designated Baltimore County Historic District
- In the floodplain
- In the Chesapeake Bay Critical Area
- On the Baltimore County Landmarks List
Do I need a building permit to build a tool shed?
In the IBS, it is stipulated that homeowners are allowed to build one detached structure that will be used as a tool shed or storage shed without the need for a building permit. It should be no more than 120 square feet.
What does the Baltimore City Department of Design and construction do?
Permits DHCD enforces the Baltimore City Building Code, as well as state laws pertaining to construction and occupancy. DHCD issues building permits and provides inspections for: construction, alteration, electrical, mechanical and plumbing work in both commercial and residential structures. All permit applications are now processed online.
Who enforces the Baltimore City Building Code?
DHCD enforces the Baltimore City Building Code, as well as state laws pertaining to construction and occupancy. DHCD issues building permits and provides inspections for: construction, alteration, electrical, mechanical and plumbing work in both commercial and residential structures. All permit applications are now processed online.
How do I apply for a building permit?
All applications for building, plumbing, electrical and other construction permits must be completed online. Public work stations and staff are available in the lobby to help customers create their online accounts and applications on a first-come, first-served basis.
When was the Baltimore County Building Code enacted?
Who is responsible for processing water meters in Baltimore?
About this website

How big of a shed can I build without a permit in Maryland?
150 square feetShed (Attached) Sheds greater than 150 square feet require a building permit before starting work. Electrical and plumbing permits may also be required.
What requires a permit in Baltimore County?
Needing a Permit Decks. Most new or replacement fences. Sheds of more than 120-square feet. Plumbing and electrical work.
Do you need a permit to build a patio in Baltimore County?
A building permit is required for decks greater than 16 inches above the lowest grade and exceeding 120 square feet, and for all decks, regardless of size, that are: Located in a proposed or designated Baltimore County Historic District. On the Baltimore County Landmarks List.
How much is a permit in Baltimore County?
A fee of $100 will be charged for each review of a permit application by the Department of Public Works or by the Department of Transportation.
Do I need a permit to build a gazebo in Baltimore County?
Accessory structures include sheds, gazebos, garages, etc. A building permit is required for accessory structures greater than 120 square feet, and for all accessory structures, regardless of size, that are located: In a proposed or designated Baltimore County Historic District.
Do I need permit for fence in Baltimore County?
Required Documents You must provide the following when submitting your permit application: Site Plans—Required for both residential and commercial fences. If commercial, site plans must be a minimum of one inch equals 100 feet, engineer's scale. If residential, view the residential site plan.
Do I need a permit to build a floating deck in Maryland?
A building permit in Maryland is typically required for all decks that are supported by footings, this is regardless of how tall or what grade the deck is built.
Do I need a permit for a gazebo in Maryland?
Gazebo Construction Electrical work for gazebos requires an application for an Electrical Permit by a Master Electrician licensed by the State of Maryland. If your home is located in a subdivision with a Homeowner's Association (HOA), a separate approval from the HOA may be necessary.
Do you need a permit for a retaining wall in Baltimore County?
A building permit is required for all retaining walls over three feet.
How long does it take to get a building permit in Baltimore County?
Over 98% of permit applications submitted with plans are reviewed in less than 30 days.
Do you need a permit to build a patio in Maryland?
Patio Construction Structures built from brick, block, pavers, stone or concrete (masonry) are classified as patios. Patios are usually built at grade. For construction of a patio built at existing grade, a permit is not required for construction.
Do you need a permit to build a fence in Maryland?
Fences taller than four (4) feet require a permit. Fences four (4) feet and under do not need a permit unless located in a HISTORICAL/PROTECTED AREA or located on a CORNER LOT.
Do I need a permit to remodel my bathroom in Maryland?
An alteration permit is required for all commercial bathrooms. A permit is not required for residential bathrooms but plumbing and electrical permits are always required.
What requires a building permit in Maryland?
For Example, you need a permit if you perform or authorize the performance of: Adding a room. Build, demolish, or move a carport, garage, or shed of more than 120 square feet and/or greater than 10' in height. Finish and attic, garage, or basement to make additional living space.
Do you need a permit for a retaining wall in Baltimore County?
A building permit is required for all retaining walls over three feet.
Do you need a permit to finish a basement in Maryland?
Permits are required for finishing a basement in Maryland. This is to ensure the work is done according to the safety ideals set out in the building and residential codes. Permit application processes may differ according to municipality. Permits can cost up to ±$400.
Baltimore County Building Permits: All You Need to Know ... - DoNotPay
Baltimore County Building Permits: Fast and Easy System to Apply! If you've done DIY construction and renovation, you know every part of the process can be a challenge, including applying for Baltimore County building permits. Not only must you determine whether your project even needs a permit, but you're also then tasked with discovering which permit you need to apply for, figuring out the ...
Permits, Approvals and Inspections Overview - Baltimore County
With over 600 square miles and approximately 847,562 people in Baltimore County, the Department of Permits, Approvals and Inspections (PAI) oversees the development and use of land.
New Dwelling Building Permit - Baltimore County
A building permit is required for construction of any new residential dwelling. Residential structures with shared common spaces (i.e. condos, apartments, high/mid-rises) are processed as commercial new structure or shell permits.. A separate permit is required for electrical and plumbing work.
DHCD Registration - Baltimore Housing
Baltimore Housing is building on our strenghts and investing in our future. We are a forward-thinking organization built on compassion, progressiveness and quality of life in Baltimore City. Welcome. We invite you to take a look at our progressive new efforts. Whether your looking for housing, interested in what's happening in your neighborhood, or simply want to find out more about our range ...
When was the Baltimore County Building Code enacted?from baltimorecountymd.gov
The most recent edition of the Baltimore County Building Code was enacted by Baltimore County Council Bill Number 40-15, which became effective on July 1, 2015. It adopted the 2015 editions of the International Building Code, the International Residential Code, the International Mechanical Code and the International Energy Code as well as local amendments.
Who is responsible for processing water meters in Baltimore?from baltimorecountymd.gov
Processing of applications for water meter services, which are prepared and forwarded to the Department of Public Works and Transportation and the Baltimore City Bureau of Water Supply
When was the Baltimore County Building Code enacted?
The most recent edition of the Baltimore County Building Code was enacted by Baltimore County Council Bill Number 40-15, which became effective on July 1, 2015. It adopted the 2015 editions of the International Building Code, the International Residential Code, the International Mechanical Code and the International Energy Code as well as local amendments.
Who is responsible for processing water meters in Baltimore?
Processing of applications for water meter services, which are prepared and forwarded to the Department of Public Works and Transportation and the Baltimore City Bureau of Water Supply
When was the Baltimore County Building Code enacted?from baltimorecountymd.gov
The most recent edition of the Baltimore County Building Code was enacted by Baltimore County Council Bill Number 40-15, which became effective on July 1, 2015. It adopted the 2015 editions of the International Building Code, the International Residential Code, the International Mechanical Code and the International Energy Code as well as local amendments.
How to get a rental license in Baltimore?from dhcd.baltimorecity.gov
In order to receive a rental license from the Department of Housing and Community Development (DHCD) the property must meet two requirements: 1) be registered with DHCD using the online portal and 2) be inspected by a State Licensed, Baltimore City registered Home Inspector.
What is DHCD in Baltimore?from dhcd.baltimorecity.gov
DHCD enforces the Baltimore City Building Code, as well as state laws pertaining to construction and occupancy. DHCD issues building permits and provides inspections for: construction, alteration, electrical, mechanical and plumbing work in both commercial and residential structures.
What is the Baltimore City Code?from dhcd.baltimorecity.gov
The Baltimore City Code, Article 13, Subtitle 11-1, requires the owner of a vacant lot assessed for $100 or more to file a registration statement with the Housing Commissioner. The Baltimore City Code, Police Ordinances Article 19, Subtitle 8, requires an alarm system contractor, monitor, and user to register each alarm system with ...
Who is responsible for processing water meters in Baltimore?from baltimorecountymd.gov
Processing of applications for water meter services, which are prepared and forwarded to the Department of Public Works and Transportation and the Baltimore City Bureau of Water Supply
Can inspections be scheduled online?from dhcd.baltimorecity.gov
NEW! - All inspections can now be scheduled online, following the prompts once you log into your existing account. This service is available 24 hours a day. Through the QuickTrac Online Inspection Scheduler, you can:
What is the Baltimore County Office of Law?from baltimorecountymd.gov
The Baltimore County Office of Law provides legal advice to the County in all civil matters and represents the County Executive, County Council, County Administrative Officer, and all offices, departments, boards, commissions and other administrative agencies of the County.
What is the phone number for the Maryland floodplain?from baltimorecountymd.gov
For questions, call the State of Maryland Floodplain at 410-537-3775.
When was the Baltimore County Plumbing Code adopted?from baltimorecountymd.gov
Examinations test for the knowledge of plumbing and gas installations and materials. The Baltimore County Plumbing Code effective as of May 1, 2013 adopted the 2012 National Standard Plumbing Code.
Does Baltimore County have a propane gas license?from baltimorecountymd.gov
Baltimore County recognizes and honors insured-to-work Propane Gasfitter Certificates in addition to the following state-issued licenses:
What is a Shed Building Permit?
A building or shed permit is a piece of paper that gives you, the homeowner, permission to construct a building on your property.
Factors That Determine if You Need a Permit for Building a Shed
Several common factors can determine whether you need to obtain approval or a building permit for a shed you want to build in your backyard.
How to Get a Shed Permit?
Getting shed permits is a relatively simple process as long as you’re prepared.
How Long Does it Take to Get a Shed Permit?
It depends on the complexity of the shed building project, but in general, building permits can take from one week to two months.
Can I Build a Shed Without Planning Permission?
Permits exist because they ensure you and your neighbors are safe. If you build a storage shed without the necessary permit, you run the risk of the following:
What is the Biggest Size Shed Without Planning Permission?
This is a difficult question to quantify as requirements vary considerably.
How to Check the Exact Shed Permission Requirements in My Area?
Shed permission requirements vary by city or town, state, or region and can be highly localized. This means you have to do your research starting with your local building department. If you’re going to do the research yourself about whether you need a permit, you need to contact your local county, town, or city zoning department.
How big should a shed be?
Most likely, if your installing or building a smaller shed under 8×10 you should be good to go, but you should always check with your county. Suburban areas are far more stricter with rules than rural counties as well.
What is a shed in a backyard?
A shed in your backyard is a great spot for storage and to use to keep all of the supplies for your yards such as a lawnmower and weedeater . When you are thinking about building a shed, there are a few factors to consider.
Do HOAs have the same paint color as your house?
Also, concerning your home and shed, certain HOAs have more rules. In certain towns, you may be required to use the same material as your house or match the same paint color as your house for your shed.
Do you need anchor points for a shed?
That means if you live somewhere where there are frequent hurricanes or tornados your building will have to comply with the rules required to make sure your shed is properly secured to the ground.
What is the phone number for a permit in Baltimore?
If you don’t find the answers you need on this page, please call us at 443-984-1809, or email your questions to [email protected]. A permit is required to: Construct, enlarge, alter, repair, rehabilitate, demolish ( interior or exterior) or move any structure.
What happens if you have a special circumstance on your permit?
Regardless of your permit type, if there is a special circumstance (e.g., your application needs to be referred to another agency, or there is a tag on your property), a staff member will send a message to you within the timeframes listed in #2.
What is DHCD in Baltimore?
DHCD enforces the Baltimore City Building Code, as well as state laws pertaining to construction and occupancy. DHCD issues building permits and provides inspections for: construction, alteration, electrical, mechanical and plumbing work in both commercial and residential structures.
How to find out if a permit has been obtained?
To determine whether a permit has been obtained for work currently under construction or to determine that the scope of work has been properly permitted, an existing permit search may be accessed by the property address, permit number or neighborhood (you can search permits issued since 1/1/2005).
Do permits require referral to another department?
Certain permits require referral to another department or agency for additional review and approval. The following conditions will trigger additional review:
Do permits require drawings?
Some permits require submission of drawings/sketches or ePlans submission. The matrices outlines which types of permits require ePlans submission, and which types of permits can be issued through e-Permits with or without drawings/sketches.
Can you schedule inspections online?
All inspections can now be scheduled online, following the prompts once you log into your existing account. This service is available 24 hours a day. Through the QuickTrac Online Inspection Scheduler, you can:
When was the Baltimore County Building Code enacted?
The most recent edition of the Baltimore County Building Code was enacted by Baltimore County Council Bill Number 40-15, which became effective on July 1, 2015. It adopted the 2015 editions of the International Building Code, the International Residential Code, the International Mechanical Code and the International Energy Code as well as local amendments.
Who is responsible for processing water meters in Baltimore?
Processing of applications for water meter services, which are prepared and forwarded to the Department of Public Works and Transportation and the Baltimore City Bureau of Water Supply

About Your Upcoming Inspection
- The structure must meet the following guidelines: 1. Must be located in the rear yard behind the rear foundation wall line, unless a zoning variance is obtained 2. Cannot occupy no more than 40 percent of the yard 3. Must be located 2.5 feet from the side and rear property lines, however an…
Schedule, Reschedule Or Cancel An Inspection
Building Permit Application and Requirements
Local Building Design Requirements
- To determine the time of a scheduled inspection, have your permit number readily available and call 410-887-3953on the morning of the inspection between 7:30 and 8 a.m.