Preparing the Surface
- 1 Sand the surface with 80- to 100-grit sandpaper. ...
- 2 Treat metal surfaces with an acid etch or a shot blast. ...
- 3 Degrease and acid etch concrete surfaces. ...
- 4 Fill in any imperfections with the appropriate filler. ...
- 5 Clean the surface with mild dish soap and water, then let it dry. ...
How do you apply tuff coat?
Where you pour the Tuff Coat depends on the type of sprayer that you are using; you should pour the Tuff Coat into the same tank that you'd pour the paint. [23] For best results, let the Tuff Coat reach room temperature before proceeding. Apply the Tuff Coat 12 to 24 in (30 to 61 cm) away from the surface.
How much tuff coat do I need for my project?
Purchase enough Tuff Coat to cover your surface. You will need 1 gallon (3.8 L) of Tuff Coat to cover 40 to 50 square feet (3.7 to 4.6 sq m). You will need 2 coats of Tuff Coat for most applications, so multiply your calculation by 2. [12] Tuff Coat is typically sold in 1-gallon (3.8-L) and 5-gallon (18.9-L) buckets.
What is a tuff coat?
Tuff Coat is a type of rubberized coating that you can apply to all sorts of surfaces, including metal, concrete, and wood. It is very durable, waterproof, and flame-resistant. The application process itself is very easy, but the prep work does take a little bit of time.
How long should I wait between coats of tuff coat?
Don't apply a thick coat. It is better to do a light, even coat. Wipe off any excess Tuff Coat with a cloth and water immediately. Wait about 30 minutes, then apply a second coat. How long this takes depends on the temperature and humidity.
How to make a tuff coat?
How to use tuff coat paint?
How to make tuff coat look like pancake batter?
How to apply primer to a surface?
How many gallons of tuff coat for 40 sq ft?
How to use masking tape?
How long does it take for tuff coat to dry?
See 4 more
About this website

Applying TUFF II Over Rigid Foam & ICF - Styro
Installation Instructions (continued) - Concrete, Brick, Masonry Block First, wire brush or pressure wash the concrete to make sure it is clean, dry, and that any loose particles are
Pettit | Pettit Tuff Coat™
• Apply by roller or spray • Chemical and UV resistant. Pettit Tuff Coat™ is a state of the art, single component, flexible, water-based product created through a unique process of cross-linking urethanes, acrylics, co-polymers and recycled rubber granules to create a long-lasting non-skid coating.
How to make a tuff coat?
1. Dampen a Tuff Coat paint roller with water, then dip it into Tuff Coat. If you want to, you can pour the Tuff Coat into a paint pan first, but this really is not necessary. Dampen the roller with plain water first , then dip it into the Tuff Coat, making sure to saturate it completely.
How to use tuff coat paint?
It's designed to work with the chemicals in Tuff Coat; other paint rollers will not pick up and spread the Tuff Coat. Apply 4 to 5 vertical strokes to your surface. Dip the roller into the Tuff Coat, then roll it across your surface, top-to-bottom, then bottom-to-top.
How to make tuff coat look like pancake batter?
Mix the Tuff Coat with a drill mixer until it looks like pancake batter. Open your can of Tuff Coat and turn the drill mixer on. Slowly lower the mixer into the paint, then continue to submerge it as it mixes the paint. Keep mixing the paint for a few minutes, until it gains a batter-like consistency.
How to apply primer to a surface?
Apply your chosen primer with a paint roller or a paintbrush. Pour the primer into a paint tray if you are using a roller, or leave it in the can if you are using a paintbrush. Apply 1 coat of the primer to the entire surface. If you are using a paint roller, choose one with a 3⁄8 in (0.95 cm) nap. Work quickly.
How many gallons of tuff coat for 40 sq ft?
You will need 1 gallon (3.8 L) of Tuff Coat to cover 40 to 50 square feet (3.7 to 4.6 sq m). You will need 2 coats of Tuff Coat for most applications, so multiply your calculation by 2. Tuff Coat is typically sold in 1-gallon (3.8-L) and 5-gallon (18.9-L) buckets.
How to use masking tape?
If you need to mask off a larger area, cover that area with paper, cardboard, or plastic sheeting first, then seal the edges with masking tape. You will remove the masking material at the very end, after you apply the last layer of Tuff Coat.
How long does it take for tuff coat to dry?
Let the Tuff Coat dry and cure completely. After about 10 to 12 hours, the paint will be ready for light wear. It will be completely dry after 24 hours. You will need to wait 5 to 7 days for it to cure completely, however.
What is tuff 2?
Tuff II is a heavy duty pre-mixed, pre-colored, 100% acrylic, ready to use protective and decorative trowel or spray on coating for ICF & rigid foam insulation. Tuff II is incredibly strong and durable. It's perfect for protecting foam near high. traffic areas and it can even be used to coat entire walls. Just adhere the Sticky Mesh HD then pop the ...
Can you trowel a tuff II?
The Tuff II can be troweled smooth or textured to an authentic stucco finish. When you are finished simply re-seal the lid for touch ups or your next project. Tuff II also bonds to a variety of surfaces including ICF foam blocks, masonry, brick and cement blocks.
How much water should I add to a TUFF II sprayer?
A: To spray TUFF II use a hopper style spray gun. Up to 6 ounces of water can be added to each pail to make the coating spray evenly.
How to remove loose coating from a drywall wall?
A: Simply remove loose coating with a wire brush and make sure the area is clean. Apply a section of sticky mesh to the area and patch it with TUFF II. If the area is deep it may require multiple coats.
When coating drywall, is it necessary to mesh the seams and corners?
When coating drywall it is only necessary to mesh the seams and corners. Pre-treat meshed areas with a thin, 1/16” coat of TUFF II. Allow the TUFF II to dry
Can you use TUFF II in direct sunlight?
A: Yes, please do not apply TUFF II unless the temperature will remain above 40 degrees F for 24 hours. Please Do Not apply TU FF II in moist conditions or over damp surfaces. Do not apply in direct sunlight.
Can you texture TUFF II?
A: TUFF II is easily textured with a brush or trowel. It is important to texture TUFF II when it is moist. When texturing with a brush keep the brush moist with clean water for best results.
Is TUFF II water based?
A: Yes, TUFF II is water based and 100% acrylic. It will wash off if cleaned before it begins to dry. Be sure to rinse it off clothes and skin immediatley. Read the MSDS for more details.
How to make a tuff coat?
1. Dampen a Tuff Coat paint roller with water, then dip it into Tuff Coat. If you want to, you can pour the Tuff Coat into a paint pan first, but this really is not necessary. Dampen the roller with plain water first , then dip it into the Tuff Coat, making sure to saturate it completely.
How to use tuff coat paint?
It's designed to work with the chemicals in Tuff Coat; other paint rollers will not pick up and spread the Tuff Coat. Apply 4 to 5 vertical strokes to your surface. Dip the roller into the Tuff Coat, then roll it across your surface, top-to-bottom, then bottom-to-top.
How to make tuff coat look like pancake batter?
Mix the Tuff Coat with a drill mixer until it looks like pancake batter. Open your can of Tuff Coat and turn the drill mixer on. Slowly lower the mixer into the paint, then continue to submerge it as it mixes the paint. Keep mixing the paint for a few minutes, until it gains a batter-like consistency.
How to apply primer to a surface?
Apply your chosen primer with a paint roller or a paintbrush. Pour the primer into a paint tray if you are using a roller, or leave it in the can if you are using a paintbrush. Apply 1 coat of the primer to the entire surface. If you are using a paint roller, choose one with a 3⁄8 in (0.95 cm) nap. Work quickly.
How many gallons of tuff coat for 40 sq ft?
You will need 1 gallon (3.8 L) of Tuff Coat to cover 40 to 50 square feet (3.7 to 4.6 sq m). You will need 2 coats of Tuff Coat for most applications, so multiply your calculation by 2. Tuff Coat is typically sold in 1-gallon (3.8-L) and 5-gallon (18.9-L) buckets.
How to use masking tape?
If you need to mask off a larger area, cover that area with paper, cardboard, or plastic sheeting first, then seal the edges with masking tape. You will remove the masking material at the very end, after you apply the last layer of Tuff Coat.
How long does it take for tuff coat to dry?
Let the Tuff Coat dry and cure completely. After about 10 to 12 hours, the paint will be ready for light wear. It will be completely dry after 24 hours. You will need to wait 5 to 7 days for it to cure completely, however.