How do you backfill a wall?
- Lay your base of compacted native soil (about three inches deep).
- Tamp the soil to ensure that it is secure and firm.
- Fill the next six to twelve inches with aggregate or gravel.
- Tamp the gravel or aggregate to ensure a sturdy base.
What is the process of backfilling?
Backfilling is the process of reusing or replacing the soil that is removed during the excavation of foundations, ground bearing slabs or other groundworks to support and strengthen a structure. It protects foundations and forms part of the substructure of slabs, roadways, walkways and other groundwork elements.
What material is used for backfill?
Backfill is the material used to refill an excavated hole or trench in your yard. This material can be the excavated soil, a mixture of sand and gravel, or commercial products. The process of backfilling usually takes place in layers.
What is backfill and example?
backfill verb (MATERIAL) [ I or T ] to fill a hole created by digging or drilling, especially using some of the material that has been taken out: Dig a large hole for the plant, then backfill with soil and compost. Finally, backfill the trench.
What is the best backfill material?
The best material for the backfilling of a retaining wall is gravel, and it should be well graded. The main reason for using gravel is because it does not retain water (small void ratio); hence lateral loads experienced will be minimal. You should also have weep holes for draining excess water that may be retained.
Can I backfill with dirt?
If you want to build up your yard and create a hill, fill dirt will be used for that purpose. Conversely, if you are trying to level out an uneven surface, fill dirt is the perfect match for the job. Fill is also frequently used as a backfill material for underground pipes, cables, and other utilities.
Is it good to backfill with sand?
Pros and Cons of Fill Sand Thanks to the nature of sand, fill sand doesn't retain moisture and is great for promoting drainage in areas that are likely to get wet. It's more aesthetically pleasing than fill dirt and therefore more suitable for exposed projects.
What does backfill mean in work?
Backfill is defined as the act of filling in a position that was left by another employee who has been moved to another role, took a justified leave of absence, or quit or lost their job due to some circumstances.
What does backfill at work mean?
Backfilling is when you replace an employee. That employee may have left the organization, been promoted, or gone on a leave of absence, but the position still needs (re)filling.
What is another word for backfill?
What is another word for backfill?provisionrefreshreloadreplacereplenishrestockrestorestockstock uptop up1 more row
Should backfill be compacted?
The backfill material shall be placed in layers not exceeding eight inches (8") in loose depth, each layer being thoroughly compacted before succeeding layers are placed.
How long does backfill need to settle?
An hour at most would be sufficient to let dirt and dust settle before you start pouring. If you have used a combination of water and rollers (or stompers) to compress the dirt, it is usually a good idea to wait for at least 4-6 hours.
What is difference between fill and backfill?
A fill refers to the product addition needed to the new growth area against the cuticle. We recommend a fill every two to three weeks. A backfill is the repositioning of the white free edge, if you wear pink and white enhancements.
What is the suitable type of backfill soil?
Types of Backfilling in Foundation Coarse-grained soils include gravelly and sandy soils and range from clayey sands through the well-graded gravels of gravel-sand mixtures with little or no fines.
What do you use to backfill a trench?
Compacted stone: This option entails compacted granular backfill, which is best suited for areas that require paving. Lean concrete: Also known as controlled density fill, this material fills the trench without the need for secondary compaction. This backfill is typically useful for narrow or heavily trafficked areas.
What type of sand is used for backfill?
For optimal performance, grits sand is the best material for this application. Grits sand compacts well and will ensure the pavers do not re-settle. Grits sand is also economical, so it can also be used in place of torpedo sand for backfill and trench fill projects.
1. Protection of Basement Structure
Basement structures such as foundation, basement wall or retaining wall provide a permanent formwork for the backfilling materials. But the protection of these structures from the backfill loads is an important part of the backfill.
2. Selection of Backfill Material
Using granular material for the backfill of the basement is never recommended as the voids between the granules attract water towards the basement wall. And if the drain tile system gets plugged, it may cause some severe problems.
3. Compaction of Backfill in Basement
If due to inacessiblity or the remoteness of the site, one has to make-do with loose excavated soil or granular soil as the backfill, special care should be taken to achieve the desired compaction levels.
4. Surface Finish of Backfill in Basment
The compacted backfill must have a hard, smooth and sloping surface to drain off the water. Usually, for building plinth, protection is provided. It drains off the roof water and protects the foundation backfill from the water.
Step 1
Calculate the volume of the space to be filled. For example, find the cubic footage volume of a backfill area that is 8 feet wide, 6 feet deep and 50 feet long. The volume of a rectangular cubed shape is found by the formula v = l x w x d, where v represents volume, l is the length of the trench, w is the width and d is the depth.
Step 2
Calculate the cubic yardage of the same trench. Backfill is typically sold by the yard. Like concrete, it should be converted from feet to yards. There are 27 cubic feet in a cubic yard. Think of a cubic yard as a cube that is 3 feet wide, 3 feet long and 3 feet deep. Divide 2400 by 27 to yield 88.9 cubic yards.
Step 3
Next you might need to fill a round hole that is 10 feet in diameter and 5 feet deep. We must first find the area of the round hole, a circle. Area is equal to Pi times the radius squared, or a = 3.14 x r^2. Applying the numbers to the formula, 3.14 x (5^2), or 3.14 x 25, the area of the base of the hole is 78.5 square feet.
Step 4
Estimate the number of truckloads that will be required to fill these two holes with backfill. Typically, smaller trucks have a 10-yard fill capacity, while larger trucks will range in capacity from 15 yards up to 20 yards. The weight of the fill material will dictate the amount of backfill that can be moved over a highway or street.
Step 5
Divide the amount of backfill from Step 2 to find the amount of truckloads needed for a 10-yard capacity truck. The answer is 8.9 loads, for a total of nine loads required.
What is a backfill position?
In the context of employment, the definition of backfill refers to the act of filling in a position left by an employee who has been moved to another role, went on a justified leave of absence, or quit/lost their job.
Strategies on how to backfill positions with top talent
Now that we’ve tackled what a backfill position is and its importance in your organization, it’s time to discuss contingency plans that you can implement before the need to fill vacancies arises in your company.
Will backfill positions work for my company?
Backfill positions offer many advantages, including minimizing recruitment costs if there’s already a qualified replacement within your organization. Likewise, cross-training reduces employee onboarding expenses and time spent hiring candidates.

Protection of Basement Structure
Selection of Backfill Material
- Using granular material for the backfill of the basement is never recommended as the voids between the granules attract water towards the basement wall. And if the drain tile system gets plugged, it may cause some severe problems. It is recommended to use the same excavated soil as the backfill with proper compaction only if the soil excavated is of good quality. If heavy, moi…
Compaction of Backfill in Basement
- If due to inacessiblity or the remoteness of the site, one has to make-do with loose excavated soil or granular soil as the backfill, special care should be taken to achieve the desired compaction levels. With time, the natural abraders like water and tectonic movements may breach into the foundation and cause superfluous settlement which could prove perilous to the superstructure. …
Surface Finish of Backfill in Basment
- The compacted backfill must have a hard, smooth and sloping surface to drain off the water. Usually, for building plinth, protection is provided. It drains off the roof water and protects the foundation backfill from the water. The minimum slope for a finished grade should be 1/2 inch per foot. Avoiding basement leakage is a lot like preventing a r...