- Drain all the water out of the pool by placing a submersible pump into the deepest end of the pool and turning it on. ...
- Remove the pool liner as directed by the manufacturer's instructions.
- Examine the vermiculite base to determine the extent of the damage. If there are broken chunks of vermiculite, remove them with your hands and discard. ...
- Pour one part of vermiculite powder and three parts of cement into a five-gallon bucket. Slowly add water to the mixture until you achieve a thick mud-like consistency.
- Gather some vermiculite onto a trowel, and place it onto the damaged section of the pool floor. ...
- Allow the vermiculite to harden and cure for two days prior to reinstalling the pool liner.
How do you use vermiculite to repair a pool floor?
Pour one part of vermiculite powder and three parts of cement into a five-gallon bucket. Slowly add water to the mixture until you achieve a thick mud-like consistency. Gather some vermiculite onto a trowel, and place it onto the damaged section of the pool floor.
How deep should the bottom of a vermiculite pool be?
Before troweling in the vermiculite you want to have your pool bottom approximately 2″ below the finished level. This is done with string lines throughout the pool bottom to the finished grade or depth of the pool floor. To install your vermiculite pool bottom you will need:
How do you mix vermiculite and cement together?
Pour one part of vermiculite powder and three parts of cement into a five-gallon bucket. Slowly add water to the mixture until you achieve a thick mud-like consistency.
How long does it take to install a vermiculite pool liner?
Before installing the liner, you need to wait for the vermiculite pool base to cure and dry. Depending on the weather conditions and temperatures, it probably takes three to five days. Installing liner before then can lead to dirt, unsightly indentations and potential algae. A vermiculite bottom sets up thoroughly in three to five days.

How do you repair vermiculite bottom pool?
2:444:41Concrete Pool Floor repair for Vinyl Liners - YouTubeYouTubeStart of suggested clipEnd of suggested clipUse a one part portland cement to one part sand mixture. So that way it's easier to sand off yourMoreUse a one part portland cement to one part sand mixture. So that way it's easier to sand off your edges with a masonry sanding block when you're finished.
Is vermiculite good for pool bottom?
Vermiculite is the usual choice of floor material for inground vinyl liner pools. it is not the cheapest option for your floor, but it is long lasting and one of the easier floor materials to install.
How thick should vermiculite pool bottom be?
between 1 and 2 inches thickAs with concrete, crews should make the vermiculite layer between 1 and 2 inches thick. Any thicker and it will void the porosity, which would defeat its purpose. Fans of this material also claim that it's easier on the liner.
Can you patch bottom of pool?
Yes, of course. Patching a pool with water in it is a simple process. The first thing you need to do is identify the area of the leak. Next, find a patch material that matches the shade of your current liner.
How do you fix vermiculite?
Gather some vermiculite onto a trowel, and place it onto the damaged section of the pool floor. Scrape the trowel across the floor to fill the damaged area, and smooth the vermiculite out in an even layer. Try to get the vermiculite to the same level as the original floor.
What happens if vermiculite gets wet?
Vermiculite insluation itself does not burn: it is non-combustible, though contaminants and debris, if mixed with any insulating material at enough volume, might burn. When wet, vermiculite can hold a lot of water, as much as 220-325% by weight, and as much as 20-50% by volume.
Can you waterproof vermiculite?
Waterproof even under high hydrostatic pressure. Used for outdoor as well as indoor applications. Very good adhesion and cohesion even on organic substrates and even after long-term or permanent water immersion.
How long does it take for vermiculite pool bottom to dry?
A vermiculite bottom sets up completely in three to five days. Although in some instances liners can be installed almost immediately after troweling, pool owners should be cautioned about using the pool until curing is complete.
Can vermiculite get wet?
No, its basically portland cement and vermiculite - it never gets as hard as concrete, but water can sit on it and it won't damage it.
How do you fix the bottom of a pool?
2:004:10How to Fix a Hole in Vinyl Swimming Pool Liner Underwater RepairYouTubeStart of suggested clipEnd of suggested clipWith your patch cut apply bonding cement to the underneath side of the patch. And lightly fold inMoreWith your patch cut apply bonding cement to the underneath side of the patch. And lightly fold in half so the glue is on the inside. Be sure to use a liberal amount of glue.
How do I fix a leak in the bottom of my pool?
4:4910:54POOL LEAK DETECTION: How to Patch a Liner | Swim UniversityYouTubeStart of suggested clipEnd of suggested clipYou need to patch the leak. And you can use waterproof tape or a peel and stick vinyl patch both ofMoreYou need to patch the leak. And you can use waterproof tape or a peel and stick vinyl patch both of these can be used underwater.
How do you fix the bottom of an above ground pool?
5:157:043 Ways to Fix-Repair-Patch Intex Above Ground Pool With Leak ...YouTubeStart of suggested clipEnd of suggested clipSo the waterworld works but I think it would be wise stop it on the inside with the water well jbMoreSo the waterworld works but I think it would be wise stop it on the inside with the water well jb weld and then followed up with a patch on the outside and that is a backyard fix.
What to look for when patching 1/2 bucket?
What you're looking for (for patching) is a little standing water after the 1/2 bucket is well mixed - a wet batch will feather in a lot better than a dry one! (TIP- use a 'margin trowel' to do the mixing, it gets into the corners at the bottom of the bucket and doesn't take as much muscle to move around) ...
Can you use a trowel to coat vermiculite?
You certainly can 'skim coat' the vermiculite. Depending on how well you can use a trowel, it is something that you can DIY. If you decide to go this route, let me know and I'll give you a few pointers on mixing and applying the vermiculite. Also be sure to take the patched floor into account when measuring for the new liner, you don't want to fix the bottom only to cause wrinkles in the new liner!
How much vermiculite to cement?
The ratio is 2 bags of Vermiculite to 1 bag of cement. The Vermiculite and cement go into the mixer and then you’ll add about two and a half 5-gallon buckets of water, until you reach an oatmeal consistency that you can trowel easily. Leave it in the mixer for about 20-30 seconds and that should do it.
How is vermiculite mixed?
How is Pool Floor Vermiculite Mixed? Vermiculite is mixed on site and in a cement mixer called a paddle mixer, which can be rented at any rental shop. You will need Portland cement on hand to complete the mix. The ratio is 2 bags of Vermiculite to 1 bag of cement.
How long does it take to install vermiculite pool bottom?
To install your vermiculite pool bottom you will need: Mix up for 20-30 seconds, dump the mix into the wheelbarrow underneath the mixer, then shovel into the 5 gallon buckets, and hand them down into the pool.
What to do after pool liner is dry?
There are other parts of the pool that can be done while this is drying. After the bottom is dry, and before installing the liner, sweep the pool bottom and remove any loose vermiculite or other debris so there is nothing on the bottom that will show up under the liner.
What is a premix?
There is another product that I know as PreMix, which is a mixture of vermiculite and cement together in one bag. Just add water! This is the same product and will give you the same results, just without the need to mix two products together. Pre-mix product is sold under such names as Pool Base or Pool Mix.
What is pre mix pool mix?
Pre-mix product is sold under such names as Pool Base or Pool Mix. If you can buy it locally, it may be worth the extra expense, but if you have to pay large shipment fees, it can end up costing 30-40% more than buying both Portland and Vermiculite locally and mixing it yourself on-site.
How long to mix a pool mix?
Shovel, a steel bullnose trowel and a wood float. Mix up for 20-30 seconds, dump the mix into the wheelbarrow underneath the mixer, then shovel into the 5 gallon buckets, and hand them down into the pool.