Place: Dig a hole to the desired depth. Place the tube in the hole, filling around the outside to secure. If the tube extends more than 2 feet above the ground line, provide additional support with a collar or wooden frame and side braces.

How do you fill in a concrete floor with a tube?

Apr 14, 2022 · How Do You Pour Concrete Tubes? Place the tube in the hole, filling around the outside to secure. If the tube extends more than 2 feet above the ground line, provide additional support with a collar or wooden frame and side braces. Fill: Be sure the Sonotube® Builder’s Tube® concrete form is dry before filling it with concrete.

How do you install a sonotube in concrete?

How do you pour concrete tubes? When you pour concrete footings, hold the cardboard concrete form tube about 12 in. up from the bottom of the footing. Do this by nailing the sides of the tube to the center of a tic-tac-toe grid of 2x4s at the top of the hole. Then dump concrete through the tube into the bottom of the hole. Click to see full answer.

How much do concrete form tubes cost?

Easy steps for professional results. Place: Dig a hole to the desired depth. Place the tube in the hole, filling around the outside to secure. If the tube extends more than 2 feet above the ground …

How do you use a form tube for footings?

Nov 08, 2021 · This process is fairly easy and can be done when the tube is three-quarters full of concrete. Simply push the rebar into the wet concrete until it reaches resistance at the …

image

Do you need rebar in concrete sonotube?

We usually recommend that a minimum of two pieces of #4 rebar be placed vertically in an 8-inch-diameter concrete pier supporting a structure. A larger-diameter pier should have four or more pieces of vertical rebar.

How deep does a concrete tube need to be?

Plan on digging about 6 inches (15 cm) deeper than the building codes require. The deeper the hole, the more solid the support will be.

Does a sonotube need a footing?

Once adjustments have been made, your Sonotube should stand evenly on its own. However, if you are using an in-ground footing, your tube should sit evenly on top of it. In theory, your Sonotube should stay in place on its own.May 28, 2020

How do you fill a concrete sonotube?

0:594:16How to Pour Concrete Footings With Piers Using Sonotubes - YouTubeYouTubeStart of suggested clipEnd of suggested clipSo what you end up with is you fill the bottom of the hole with cement and you have a wider 18. OrMoreSo what you end up with is you fill the bottom of the hole with cement and you have a wider 18. Or 20 inch circumference of cement in the bottom of the hole.

Do you remove concrete tube forms?

Watch out: Never remove a concrete form before the concrete has cured enough to carry its load - else the pier will collapse. Concrete form tubes such as Sonotubes should in fact be removed where fire rating is important, as the form tubes themselves are not fire-rated.

Do you leave sonotube in ground?

Your sonotube should only be below ground level a few inches, just enough into the hole to help hold it. Know how you are bracing your sonotube with 2x4, screws, and stakes.Apr 9, 2018

How many bags of concrete do I need for a sonotube?

Concrete MixesSONOTUBE# of bags required per:25 kg8" x 4' tube3.28" x 8' tube10" x 4' tube5.110" x 8' tube12" x 4' tube7.312" x 8' tube6 more rows

How do you dig a hole in a sonotube?

1:074:24Digging Footings for Decks and Other Outdoor Projects - YouTubeYouTubeStart of suggested clipEnd of suggested clipOne tool you'll need no matter what type of digging you do is a clamshell post hole digger.MoreOne tool you'll need no matter what type of digging you do is a clamshell post hole digger.

How do you build a house on Sonotubes?

4:1910:32Ledger, Sonotubes, & 2nd Pour — CONTAINER HOUSE BUILD - Ep. 5YouTubeStart of suggested clipEnd of suggested clipIt's not easy cutting straight cuts into circular forms so we found this technique and it workedMoreIt's not easy cutting straight cuts into circular forms so we found this technique and it worked really well we cut a four inch part off the top of the sonotube. Made a cut perpendicular.

What can I use instead of sonotube?

Pro Post Foundations screw piles in return, should be considered as your best alternative to concrete sonotubes.

What is a Sono tube?

Sonotubes are cardboard tubes in which concrete is poured to create solid concrete, cylinder-shaped pillars. For people looking to install twenty-foot columns, sonotubes serve both a structural and esthetic purpose.

How deep do concrete piers need to be?

Thickness. The minimum thickness for a pier is 8 inches. The minimum thickness for pier footings is 8 inches or 1-1/2 times the length of the footing projection from the pier, whichever is greater.

Deck supplies

We ordered all our deck material from Morrisburg Building Centre and had it delivered on April 7. That weekend we went ahead and officially started building by starting with the concrete deck footings and sonotubes.

1. Dig the holes

Depending on your type of soil, there are several different options for digging your holes. You can use a post hole auger, which is probably the easiest if you have sandy soil. Our soil has a lot of rocks in it and the post hole auger wouldn’t have worked very well.

2. Frame the footings

On Saturday we built 2′ x 2′ frames for the footings using 2″ x 6″ pressure treated lumber. The holes had to be a little over 4 feet deep to make sure that no frost could get under the footings. We had to place the footings exactly centred where the 6 deck posts would go, and make sure they were perfectly level.

3. Pour the footings and add rebar

We also ordered the portland cement from Morrisburg Building Centre, and a load of gravel delivered for the concrete. Doing a big project likes this during a pandemic can make tool rental a little more difficult. Instead of renting a concrete mixer for this project, we were able to find a used mixed that we bought.

4. Pour the sonotubes

The next day once the footings were mostly dry, we put the cardboard sonotubes over the rebar, centred them in the footings and under the string lines, and made sure they were level. Then we also braced them in both directions using 2″ x 4″s. Then we mixed up the concrete and shoveled it into the sonotubes.

5. Backfill the sonotubes

After letting the concrete cure for about a day, Tony backfilled them using the mini excavator.

For your DIY projects

The easy-to handle Sonotube® Builder’s Tube® concrete form is just the right tool for professionally forming round concrete supports for dozens of projects around the home.

Estimate your needs

The Sonotube Builder’s Tube concrete form requires no assembly. They are ready to use the moment they are needed. The only preparation you may need is to cut the easy-to-handle lengths to fit the exact size of the project. Consult the following chart to estimate the amount of concrete you will need.

Easy steps for professional results

Place: Dig a hole to the desired depth. Place the tube in the hole, filling around the outside to secure. If the tube extends more than 2 feet above the ground line, provide additional support with a collar or wooden frame and side braces.

What is Handyman's World?

Handyman's World is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to amazon. com.

Why are sonotubes used?

Sonotubes were designed to resolve a decades-old problem associated with creating concrete columns. Traditionally, that process was very labor-intensive and required the installation of specialized molds. These molds then had to be removed when the column dried, which further slowed down the construction process.

What is a sonotube?

First and foremost, “Sonotube” is a trademarked name for a specific brand of large, reinforced cardboard tubes. These tubes are designed for placement in a pre-dug hole, after which they are filled with concrete. After giving the concrete time to set, the cardboard tube can then be cut away in mere minutes.

How big is a sonotube?

These sizes are based upon the diameter of the tube, which ranges from 8 to 56 inches. Sonotubes today also come in a variety of lengths, including units all the way up to 18 feet in total length. Sonotubes vs.

Can you fill a sonotube with concrete?

Once your Sonotube is in place and secured, you can begin to make the concrete you’ll use to fill the tube. The type and mix ratio of concrete you use in this situation will vary based upon the type of column you’re making and the environment in which it will exist.

How long does it take for a concrete column to dry?

Once you have allowed your concrete column to dry fully (which may take more than 24 hours), you can begin the process of removing the cardboard tube. This is typically done using an electric saw, which should be well balanced to prevent the blade from contacting the concrete.

Can you use a sonotube with a piece of cardboard?

Once you’ve fully filled your Sonotube, you’ll want to even off its cap. This can be done with any piece of flat, level material, such as a piece of cardboard or wood. You can even use your hand, so long as you wash off excess concrete from said hand immediately.

image

1.How to Use Concrete Form Tubes: 14 Steps (with ... - …

Url:https://www.wikihow.com/Use-Concrete-Form-Tubes

30 hours ago Apr 14, 2022 · How Do You Pour Concrete Tubes? Place the tube in the hole, filling around the outside to secure. If the tube extends more than 2 feet above the ground line, provide additional support with a collar or wooden frame and side braces. Fill: Be sure the Sonotube® Builder’s Tube® concrete form is dry before filling it with concrete.

2.How to Pour a Concrete Slab for Beginners DIY - YouTube

Url:https://www.youtube.com/watch?v=k1XFWNT7pAM

19 hours ago How do you pour concrete tubes? When you pour concrete footings, hold the cardboard concrete form tube about 12 in. up from the bottom of the footing. Do this by nailing the sides of the tube to the center of a tic-tac-toe grid of 2x4s at the top of the hole. Then dump concrete through the tube into the bottom of the hole. Click to see full answer.

3.How to pour concrete deck footings and sonotubes - The ...

Url:https://thevanderveenhouse.com/concrete-deck-footings-and-sonotubes/

11 hours ago Easy steps for professional results. Place: Dig a hole to the desired depth. Place the tube in the hole, filling around the outside to secure. If the tube extends more than 2 feet above the ground …

4.How to pour concrete on the 1st floor roof, and complete ...

Url:https://www.youtube.com/watch?v=0TVBHa53cqs

26 hours ago Nov 08, 2021 · This process is fairly easy and can be done when the tube is three-quarters full of concrete. Simply push the rebar into the wet concrete until it reaches resistance at the …

5.How to Use Builders Tube® - Sonotube

Url:https://www.sonotube.com/sonotubeconcreteforms/builderstube/howtousebuilderstube.aspx

24 hours ago Form Tubes are a single cylindrical heavy-duty cardboard form designed to replace labor-intensive wood forms. It can be used for above or below grade applications for concrete footings, piers, …

6.All About Sonotubes: What Are They, How to Use Them, …

Url:https://handymansworld.net/sonotubes/

2 hours ago Available in North America EasyPour™ Weathershield™ Concrete Forming Tubes Economical one-time use with easy placement. Lightweight, easy to store and erect. Perfect for columns, …

7.EasyPour™ Weathershield™ Concrete Forming Tubes - …

Url:https://www.greif.com/product/easypour-weathershield-concrete-forming-tubes/

23 hours ago

8.Videos of How Do You Pour Concrete Tubes