
Why choose at Toll Brothers for your next home?
Toll Brothers were great to work with and the communication was honest and prompt. We even had a Toll VP from out of state walk through our home with us. He was a fun guy and complimentary of the choices/designs of the home. The home turned out great and we love it.
Will Toll Brothers'Flooring engineer fail himself?
He was dismayed when the engineer Toll Brothers sent out to his home deemed the construction of the floor to be "within tolerance," and later found out it was one who engineered the home in the first place. "Of course he's not going to fail himself," Steinke said. Carroll said this is standard procedure.
Did you ever build with toll?
We did not build with Toll as that wasn’t an option at the time, but they are now opening a luxury golf course community near us. There is a definite buzz about it. Mostly due to the lifestyle being sold. On that point, research the management company assuming you have an HOA. You’ll be stuck with them long after the builder leaves.
When did you close on your Toll Brothers home in Aurora?
We are in Aurora Colorado and looking for some feedback about Toll Brothers in this area. Our estimated closing on a TB house in Aurora, CO is early December. We Signed the contract in oct 2020.
See more

How long does it take to build a mansion from start to finish?
On average, it takes seven months to build a house from start to finish, according to a 2019 U.S. Census Bureau report....Build Time by Home Type.Home TypeAverage Build Time (2019)Owner-built12 monthsContractor-built9 monthsBuilt-for-sale6 months5Jan 17, 2022
How fast can a house be built?
Custom-built homes average around nine months, while personalized production plans average near seven months. Because the floor plans used by production builders have been built many times before, there are generally fewer delays.
How long does it take to build a house kit?
In general, if we talk about traditional custom-made homes (built entirely on-site), it can take anywhere from 6 months to 5 years. Prefab houses, be it pre-cut kit homes or element ones, are usually built in a much shorter timeframe.
Will Toll Brothers negotiate price?
Yes, you can negotiate the price with Toll Brothers. This is particularly necessary when you are buying a new house from them. Items that can be negotiated include lot premium sales price, builder-paid closing costs, the upgrades made available, amongst others.
Can a house be built in 3 months?
Depending on square footage, weather conditions, and the availability of workers and supplies, the construction of a new home can take anywhere from three months to over a year.
Can you build a house in a week?
The Impossible Dream can be achieved with a lot of hard work, dedication, and some good fortune. There are plenty of people who have successfully built houses in just one week (some even manage to do so in only two days!).
Do kit homes hold their value?
The good news: Many real estate professionals agree that kit or modular homes can appreciate in value over time and are often appraised similarly to stick-built homes (as opposed to mobile homes, which often depreciate in the same way that vehicles do).
Is it cheaper to build or buy a house?
As a rule of thumb, it's cheaper to buy a house than to build one. Building a new home costs $34,000 more, on average, than purchasing an existing home. The median cost of new construction was $449,000 in May 2022.
What part of building a house takes the longest?
How long does each stage of construction take?The slab or base stage: 1-2 weeks.Frame stage: 3-4 weeks.Lockup stage: 4 weeks.Fit-out or fixing stage: 5-6 weeks.Practical completion stage: 7-8 weeks.
What Windows does Toll Brothers use?
Andersen Windows do."
How long is Toll Brothers warranty?
a 10-yearFor lasting peace of mind, we also give you a 10-year limited warranty.
How long does it take to frame a 3000 sq ft house?
Framing a home usually takes 5-8 weeks. It also depends on the type of home you are building, the size of the home you are building, and the location. So, at this point, if all has gone according to plan you can expect to be on your 3rd month when your framing begins. Included in framing is the roof of the home.
How long does it take to build a 4000 sq ft house?
A general rule of thumb is 10 months to 2 years, for construction of a true custom home. It might be possible to complete a semi-custom home project in 6-8 months (with a great team and good luck) but for a fully customized home, it's safe to assume that the build will require at least 10 months.
How long does it take to build a house in Florida in 2022?
Patience and preparation are key. The average Florida home construction build time is approximately seven months, but this timeline can be delayed by several things such as: Bad weather. Material and labor supply.
How long does it take to build a 2 story house?
In a perfect world, depending on the site and zoning classification, it typically takes from three to six months to build a house. However, given the current state of supply chain slow-downs, labor shortages, and increased building demand, it's more realistic to factor in a few months of delay.
What makes Toll Brothers a great home builder?
We are honored to be America's leading luxury home builder for more than 50 years. We are here to help you find or build your dream home in one of...
Where does Toll Brothers build?
Toll Brothers currently builds in over 60 markets across 24 states and is constantly looking at expanding into new areas. Building in the best loca...
When will Toll Brothers build in my area?
Toll Brothers is always looking to stay ahead of market trends and expand into new areas. Continue to monitor the map on our website for the latest...
Does Toll Brothers build custom homes?
While Toll Brothers is a luxury home builder, we are not by definition a custom builder. Many of our communities offer numerous personalization opt...
Can I still personalize or make upgrades to my new home?
Home buyers have multiple floor plans to choose from with a wide variety of options to personalize various spaces throughout the home. Onsite Sales...
Will Toll Brothers build on my lot?
Toll Brothers builds planned communities. You can search all of our active communities by location, and while we are not currently building on priv...
Is Toll Brothers a public company?
Yes, Toll Brothers has been publicly owned and traded on the New York Stock Exchange under the ticker symbol TOL since 1986. Toll Brothers is proud...
Is Toll Brothers a Fortune 500 company?
Yes, Toll Brothers, an award-winning FORTUNE 500 company founded in 1967. To learn more, please visit our Investor Relations website.
Who owns Toll Brothers and how long has Toll Brothers been in business?
Toll Brothers was founded in 1967 by Bob and Bruce Toll. Inspired by their father, a home builder, the brothers built their first two homes in sout...
How do I become a part of the Toll Brothers team?
The Toll Career Center is updated daily to reflect the most current job openings for Toll Brothers and all of its subsidiary operations. On the hom...
How long does it take to build a Toll Brothers home?
Building a new construction Toll Brothers home will take up to 12 months. Our mortgage company, TBI Mortgage will provide a mortgage commitment within 45 days of receiving a borrower’s loan application and supporting documents.
When was Toll Brothers last updated?
By Toll Brothers 5 minute read. 433 LIKES. Last updated on November 17th, 2020. It’s exhilarating when you receive a brand new set of house keys and open the door to your dream home. Until you get to that point, there are many details, deadlines, and decisions to consider, specifically during the mortgage process.
How long does TBI lock solid rate protection last?
Fortunately, TBI Mortgage offers LockSolid Rate Protection, which can secure your rate for up to 12 months.
How long does it take to frame a house?
Framing takes 2-to-5 weeks depending on home size and floor plan complexity. Once framing is complete, roof paper and windows will be installed.
How long does it take to get a building permit?
Some communities require ACC or HOA review and approval. It takes a few weeks to prepare all the documents.
How many points are there in a construction quality check?
Your Construction Manager and a Quality Assurance Representative have four scheduled Quality Check (QC) points throughout the schedule.
Is Toll a good company?
My experience with Toll is that they are not good at high end builds. Maybe ok for starter home. There is zero attention to detail in the finishing touches as far as trim work etc. just checking boxes. Terrible customer service as well. I’m horribly disappointed and sad that I spent so much money and an constantly reminded of the poor quality
Will the Toll Brothers go bankrupt?
The Toll Brothers are unlikely to go bankrupt, but there's possibly a reason they're the Toll Brothers - they'll often take a toll in other ways. Yes, check how they work in the region you plan to build in - since the crop of subcontractors they'll use will obviously differ.
Can you use Toll Brothers in Florida?
Don't use Toll Brothers in Florida. There are Class Action Lawsuits ALL over the place with them. We have the Shottiest Subs in the U.S. right now. Trust me!
Who said Toll Brothers should be more responsive to customer complaints?
Steinke said Toll Brothers should be more responsive to customer complaints, particularly with the housing market in the condition it's in.
Who completed the Gray Dirt of Home?
THE GRAY, GRAY DIRT OF HOME: Power Ranch resident Kevin Olson’s house has been missing its landscaping since the house was completed by Toll Brothers more than a year ago.
Can Toll Brothers release engineering drawings?
Carroll said Toll Brothers doesn't have the authority to release engineering drawings to customers because the drawings are subject to copyright, but homeowners and their representatives can come into the Toll Brothers offices to review them.
Does Toll Brothers stand behind their homes?
Carroll said Toll Brothers does stand behind its homes. "Our 10-year limited warranty closely follows the Registrar of Contractors Guidelines and Standards, and if there's something wrong with a construction issue under warranty, we fix it, no matter what it takes," he said. Watch this discussion.
