In conclusion, the PMP
Project Management Professional
Project Management Professional (PMP) is an internationally recognized professional designation offered by the Project Management Institute (PMI). There are currently 694,536 active PMP certified individuals and 274 chartered chapters across 204 countries and territories worldwide.
Agile software development
Agile software development is a set of principles for software development in which requirements and solutions evolve through collaboration between self-organizing, cross-functional teams. It promotes adaptive planning, evolutionary development, early delivery, and continuous impr…
Waterfall model
The waterfall model is a sequential design process, used in software development processes, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of conception, initiation, analysis, design, construction, testing, production/implementation …
What is the difference between Waterfall and agile project management?
Waterfall versus Agile. There are some key differences between a traditional waterfall project and an agile project and these include the following: Waterfall. Detailed, long-term project plans with single timeline. Definitive and rigid project management and team roles. Changes in deliverables are discouraged and costly.
What is the PMBOK® Guide for Agile projects?
The PMBOK® Guide takes the view that stakeholder influence occurs up front and then declines throughout the rest of the project (PMI, 2004, p. 21). In agile projects, however, the stakeholders’ influence remains strong and does not decrease until the product is released and the project is over.
Is a waterfall methodology appropriate for PMBOK® Guide practices?
The PMBOK® Guide states that the transition from one phase to another usually involves some type of technical transfer or hand-off (PMI, 2004, p. 20). This is the type of phrasing that might lead readers to believe that only a waterfall methodology is appropriate when following PMBOK® Guide practices.
What is waterfall project management?
Waterfall is the “old school” way of managing projects. Throughout the life of the project, there are well-defined stages with formalized hand-offs from one to the next. Moreover, all of the requirements for each step is completed before the next begins.

Is PMBOK Agile?
Some believe PMBOK and Agile are not compatible, as the former is based on a traditional, plan-based model while the latter takes a far more flexible approach. PMBOK is rooted in practices that were first documented in the 1980s, with the first edition of the PMBOK Guide published in 1996.
Is PMBOK same as waterfall?
Waterfall gives a basic roadmap for development, where as PMBOK gives a repository of techniques to manage that development process better. Of course, this means PMBOK practices are not unrelated to Waterfall, as the guide covers many essential aspects of being an effective project manager in a Waterfall environment.
How do you know if a project is Agile or waterfall?
Agile and Waterfall are two popular methods for organizing projects. Waterfall is a more traditional approach to project management, involving a linear flow. Agile, on the other hand, embraces an iterative process. Waterfall is best for projects with concrete timelines and well-defined deliverables.
What is the PMBOK methodology?
The PMBOK refers to the five process steps of project management: initiating, planning, executing, controlling, and closing. It contains many processes and techniques of project management by which to evaluate or complete the way you run your projects or the methodology you use.
In which type of projects PMBOK is used?
PMBOK enables businesses to standardise projects across different departments. This means employees in the marketing department will use the same approach for a project as those working in the finance department.
What is the difference between PMBOK and Prince2?
At the most basic level the difference between PMBOK Guide and PRINCE2 is that PRINCE2 is a defined methodology with roles and responsibilities and deliverables, whereas, PMBOK Guide is essentially a collection of good PM principles, techniques and guidelines that help you manage projects.
Is SDLC Waterfall or Agile?
Agile and Waterfall are both Software Development Lifecycle (SDLC) methodologies that have been widely adopted in the IT industry. The Waterfall framework was designed to enable a structured and deliberate process for developing high quality information systems within project scope.
Which projects use Waterfall model?
Some of the industries that regularly use the waterfall model include construction, IT and software development. As an example, the waterfall software development life cycle, or waterfall SDLC, is widely used to manage software engineering projects.
Why is Scrum better than Waterfall?
If we must pinpoint the main difference between Scrum and Waterfall as methodologies for software development, it would be that Scrum is value-based with shorter iterations and Waterfall is schedule-based with clearly estimated costs and plan.
What are the 4 types of project management?
Types of project management approaches and methodologiesWaterfall. Waterfall is often called the “traditional” project management approach. ... Agile. Agile is an approach to project management that is built on small, incremental steps. ... Lean. ... Scrum. ... Kanban.
What are the 5 process groups of PMBOK?
The PMBOK® Guide organizes the Project Management Processes in five groups: initiating processes, planning processes, executing processes, controlling processes and closing processes.
What is the purpose of PMBOK?
The PMBOK® goal is to enable organizations to standardize project management practices across departments. It also helps project managers work with a standardized system across organizations. This means that a project manager who moves from one company to another can use the same practices.
What is the Pmbok waterfall?
The waterfall methodology outlines the processes of analysis, design, coding, testing, and deployment, which were all done as part of a project. Because these are things that are all done within an iteration in agile, the logical assumption for many was that an iteration equaled a project.
What is waterfall in project management?
The waterfall methodology is a project management approach that emphasizes a linear progression from beginning to end of a project. This methodology, often used by engineers, is front-loaded to rely on careful planning, detailed documentation, and consecutive execution.
What are the 5 process groups of Pmbok?
The PMBOK® Guide organizes the Project Management Processes in five groups: initiating processes, planning processes, executing processes, controlling processes and closing processes.
What is difference between Agile and waterfall?
The main difference is that Waterfall is a linear system of working that requires the team to complete each project phase before moving on to the next one while Agile encourages the team to work simultaneously on different phases of the project.
What is Agile project?
Agile is a project methodology and approach that is derived using Lean thinking. Agile projects apply “Lean” concepts in the information technology environment. It is the proven project management methodology that encourages the following key concepts: Frequent inspection and adaptation.
What is waterfall project?
Traditional waterfall project methodologies have been used for years to implement complex and large-scale enterprise resource planning (ERP) projects. Often, ERP projects are over budget and late in schedule. Stakeholders are often disappointed in the delayed realization of benefits and the quality of the delivered product. In today's economy, it is a reality that we need to be able to deliver our projects with fixed constraints on resources.
What happens if agile adoption is not managed well?
If agile adoption is not managed well, the team will continue to deliver bad products but sooner, and doomed projects will fail faster. People are most comfortable with what they know: Project team members are familiar with the phases and deliverables of the waterfall life cycle.
What is agile business?
A business approach that aligns development with customer needs and company goals. Some of the foundations of agile include the following: Empiricism – Ability to perform, stop, reflect, improve, and continue in a step-by-step process in efforts to increase productivity.
Is Agile a good project?
Agile is a very successful project approach, and ERP projects provide a great target for achieving accelerated benefits by using this approach. This material has been reproduced with the permission of the copyright owner. Unauthorized reproduction of this material is strictly prohibited.
When is a customer involved in a project?
Customer is typically involved only at the beginning and end of a project
Is agile ERP good?
For years, large-scale ERP projects have been delivered using these “tried and true” project approaches. Unfortunately, however, we also have seen many projects that have under-delivered in quality or functional capability as well as run over schedule and over budget. There are many reasons why these projects experience these challenges, which are usually not due to the methodology or approach. The agile approach, however, where it is deemed to be the best approach, will expose project risks to management earlier in the project and force key decisions that may prevent typical project issues from arising.
Which is better, waterfall or agile?
When choosing between Agile and Waterfall, consider how involved the project owners or stakeholders will be in the project. Agile is better suited for projects where stakeholders are closely involved every step of the way. Waterfall is a more structured project management method and does not lend itself to the same type of flexibility.
Why is Agile used in waterfall?
Agile methodology was developed as a response to Waterfall’s more rigid structure. As a result, it’s a much more fluid form of project management. A software development project can take years to complete, and technology can change significantly during that time. Agile was developed as a flexible method that welcomes incorporating changes of direction even late in the process, as well as accounting for stakeholders’ feedback throughout the process.
Why is waterfall less flexible?
The budget for projects using Waterfall methodologies tends to be less flexible because the project is mapped out from the beginning. With Agile, there is more room to change direction as the project develops, so the budget is also subject to change. Similarly, the timeline with Waterfall is set from the start, while it’s more flexible with Agile and dependent on how the project develops.
What is waterfall in software development?
The main difference is that Waterfall is a linear system of working that requires the team to complete each project phase before moving on to the next one, while Agile encourages the team to work simultaneously on different phases of the project.
What is waterfall methodology?
Waterfall methodology is a linear form of project management ideal for projects where the end result is clearly established from the beginning of the project. The expectations for the project and the deliverables of each stage are clear and are required in order to progress to the next phase.
What is agile flexibility?
Flexibility is built into the Agile method. Agile values short bursts of work, which are called sprints. The method welcomes adapting to different directions, incorporating new information even at a later stage of the project.
What is Agile team?
In Agile, the team will work on phases of the project concurrently, often with short-term deadlines. Additionally, the team, rather than a project manager, drives the project’s direction. This can empower the team to be motivated and more productive, but also requires a more self-directed team.
When Should Agile vs. Waterfall Be Used?
Strict adherents of Agile or waterfall might insist it’s appropriate for any situation , but in reality , different types of projects are better suited for one versus the other.
What are the Pros and Cons of Agile vs. Waterfall?
Like anything else, waterfall and Agile have their plusses and minuses. Here’s a quick breakdown of the good and the bad of each:
What is Agile?
Agile is the new kid on the block, relatively speaking, and prizes rapid iteration, autonomy, and flexibility. It was conceived specifically as a reaction to waterfall’s perceived shortcomings.
How long is an Agile sprint?
In an Agile environment, you are divvying up work into Sprints, which are time-based bursts of activity, typically one-to-four weeks in length. This cadence dictates how much work is completed during a given period. The goal is to deliver value to the customer or user as quickly and often as possible.
Why is agile good?
Agile works well for projects that prize learning and are seeking or refining their product-market fit. The speed and flexibility of Sprints dovetail nicely with a continuous feedback loop and ongoing experimentation and tweaking.
How long does a waterfall project last?
Although there are dates and schedules in a waterfall environment, each stage and project lasts until completion unless the rolling out initiative was specifically designed to be in phases comprised of multiple projects that build on one another.
What is waterfall project?
Waterfall is the “old school” way of managing projects. Throughout the life of the project, there are well-defined stages with formalized hand-offs from one to the next. Moreover, all of the requirements for each step is completed before the next begins.
What is the phase of a project?
Phase of the project: Depending on the project and/or the methodology, for example: requirements, feasibility, planning, design, construct, test, turnover. Here, each time can be different and a lot depends on the specifics of the project, the organization, and of course the methodology adopted.
Does PMBOK talk about agile?
The PMBOK does not say a lot about agile, and the details of how the two worlds/publications are to each other can be read more about in the Software Extension to the PMBOK Guide. But let’s start from the beginning.
Can you compare PMBOK and Agile?
It is clear that we can not compare them with each other. Second: PMBOK allows the use of both: ‘waterfall’ – called ‘a predictive project life cycle’, as well as ‘agile’ – ‘an adaptive life cycle’.
What is there in Manifesto for Agile Software Development?
The manifesto’s primary focus is software development and consists of 4 values and 12 principles. I am not quoting those principles here as they are very specific to software development but the stated values are relevant to many other areas and can be easily interpreted by anyone who understands project or product development.
What is agile?
Agile when I say refers to Manifesto for Agile Software Development that was defined by 17 developers in February of 2001 and consists 4 values and 12 principles. Many claims Agile way of working was in existence before 2001 and I believe that’s true because Scrum was introduced through HBR paper “ New New Product Development Game ” in 1986. I admit my ignorance to anything beyond that so will I will stop at that. Now,however we see many versions of agile like agile way of working, enterprise agile and business agility and so on.
What is Waterfall?
Waterfall is about executing work inphasesor sequence like we do for a data center – plan, design, build, commission, optimize, assess etc.and involves capacity planning, cost analysis, civil work, procurement, installation, commissioning and certification etc. These can’t run in parallel like what we do in software development where everything gets executed in parallel or overlapping.
Is PMI – Project Management approach similar to waterfall?
In the image belowit clearlypromotes continuous planning and execution and talks about regular monitoring &controlling. It takes about same PDCA (Plan-Do-Check-Act) cycle that we talk about on name of agile development and states that initiation & closure is one time that too not applicable at the project level but atall phases.
What is waterfall project management?
Waterfall (sometimes referred to as ‘Traditional’) Project Management involves an in-depth upfront planning process and follows a linear, pre-determined project schedule over a specified period of time. These projects are typically predictable, have a definitive end date, and have explicit procedures of how projects are initiated, planned, executed, monitored and controlled, and closed (Deming’s Plan-Do-Check-Act Cycle). The advantages of using the Waterfall method to manage projects is having clear expectations and meeting those expectations by achieving certain milestones. Waterfall originated in the Manufacturing industry because changes in scope mid-project were usually very costly. Generally, companies use Waterfall on their projects when:
Why do companies use waterfalls?
Generally, companies use Waterfall on their projects when: They have executed a similar type of project previously, and it is almost cookie-cutter. Specific project scope and requirements can be determined.
What is waterfall model?
The Waterfall model is traditional in nature but can be advantageous in many ways. A predictable and static workflow exclusively allows the team to calculate the budget of the project appropriately and gives a picture of the deadline.
What is project management?
It is not just a skill set but also a practice. Managing a project and its phases of initiating, planning, executing, controlling and closing a project are called project management. The first objective that guarantees the success ...
What is Agile management iterative methodology?
Agile management iterative methodology that guides the success of a project. Iterative means it is completed in small sections or single development cycles. Each iteration is analyzed by the team members and the various stakeholders involved, and the further direction of the project is decided upon.
Which methodology is used to complete all phases of a project at once?
All the project phases are completed at once in chronological order in the Waterfall model, while in the Agile methodology, an iterative development approach is followed.
Why is it important to reference prior projects?
Reference to prior projects also helps in doing the much-needed groundwork better.
Does waterfall require customer participation?
While Waterfall methodology requires customer participation only at milestones, the Agile Project management customer is available throughout the process and gives regular feedback.
Is Agile management iterative?
Agile management is iterative in nature and is completed in sections. So, it has many advantages of its own:

The Project Management Institute and The PMBOK® Guide
Project Life Cycle
- The PMBOK® Guide defines the project life cycle as “a collection of generally sequential project phases whose name and number are determined by the control needs of the organization or organizations involved in the project” (PMI, 2004, p. 368). These phases are a collection of logical groupings of related activities that usually culminate in a deliverable. The PMBOK® Guidedescri…
Project Management Processes
- Walter A. Shewhart’s Plan-Do-Check-Act (PDCA) model, also known as the “Shewhart cycle,” was made popular by the quality guru, Dr. W. Edwards Deming. The PMBOK® Guide acknowledges this iterative method of continuous improvement and mapped its project management process groups to the PDCA cycle (Exhibit 4). These project management proces…