
What does eobt stand for?
Mar 31, 2020 · What is EOBT? When submitting a flightplan, the aircraft operator includes an estimated off block time (EOBT), which is the time at which the aircraft is planned to leave the gate at its departure airport. The taxi time is the time it takes from the aircraft leaves the gate (EOBT) until it is ready for takeoff at the runway.
What is the maximum difference between tobt and eobt?
3 meanings of EOBT abbreviation related to Aircraft: Aircraft. Aircraft. Aerospace. Aviation. Technology. Forecasting. 1 / 5. Sort.
What happens if I change the estimated off-Block time (eobt)?
Flying EOBT abbreviation meaning defined here. What does EOBT stand for in Flying? Get the top EOBT abbreviation related to Flying.
What does tobt stand for?
EOBT: Estimated Off Block Time. Miscellaneous » Unclassified. Rate it: EOBT: Electron and Optical Beam Testing. Miscellaneous » Unclassified. Rate it: EOBT: Expert Opinion in Biological Therapy. Academic & Science » Biology. Rate it: EOBT: Expert Opinion on Biological Therapy. Academic & Science » Biology. Rate it: EOBT: Estimated Off Blocks Time. Computing » IT. Rate it:

What is Estimated Off Block time?
The estimated time at which the aircraft will begin movement associated with departure.
What does TSAT mean in aviation?
Target Start-Up Approval TimeTSAT Definition: The Target Start-Up Approval Time (TSAT) is the time that an aircraft can expect start-up approval from ATC in accordance with the Dublin A-CDM procedures.
What is aircraft Ctot?
CTOT is a tactical slot allocation time calculated to determine the time at which a flight is required to become airborne. Target Time of Arrival (TTA) is a progressively refined planning time that is used to coordinate between arrival and departure management, and to support DCB.
What is TOBT in aviation?
Target Off Block Time (TOBT): The time that an Aircraft Operator / Handling Agent (AO/HA) expects to be ready to leave their stand.
What is aircraft slot time?
In the context of airport coordination, a slot is an authorization to either take-off or land at a particular airport on a particular day during a specified time period. This authorization is for a planned aircraft operation and is distinct from air traffic control clearance or similar authorizations.
How do you calculate takeoff time?
1:011:56What is the Calculated take off time? - YouTubeYouTubeStart of suggested clipEnd of suggested clipIf a slot is missed a new one is assigned. Summary each airport. And air traffic control sector hasMoreIf a slot is missed a new one is assigned. Summary each airport. And air traffic control sector has a published maximum capacity when capacity is exceeded measures. Are taken to reduce the traffic.
In practice
Aircraft operators can delegate to EUROCONTROL NM the filing of DLA messages for departures from designated A-CDM airports. For flights operated by an AO that has delegated the DLA-filing, NM will automatically file a DLA message using the TOBT values in the DPI messages received.
Discrepancy trigger
At the activation of the service the EOBT – TOBT discrepancy parameter value needs to be specified. The default value is 15 min. This means that every TOBT value received by NM, which exceeds the EOBT by more than 15 min, triggers a DLA message. However, a different parameter value (e.g. 10 min) may be recommended for certain A-CDM airports.
Recommendations
TOBT values are normally made available to us at target start-up approval issue time (TSAT), which is around 30-40 min before TOBT. After this timeframe, the TOBT is considered confirmed and reliable. Therefore, the earliest automatic update of the EOBT can be expected in this period.
Interested?
If you are interested in our service but have no previous experience with it, we recommend starting with a trial period during which the service would be activated for a limited number of airports (based on the three-letter ICAO code of the AO). For any questions, do not hesitate to contact us.
What happens if a flight does not ask for start up approval?
If a flight does not ask for start-up approval within the TSAT tolerance, its TOBT is deleted and it will be suspended. You can effect a de-suspension simply by entering a new TOBT.
Can you move TOBT to TSAT?
When TOBT and TSAT differ, you can always move TOBT closer to TSAT without causing another TSAT delay. So please adjust your TOBT as soon as possible to your new plans. Only if you move TOBT beyond TSAT, a new TSAT will be calculated.
What is EOBT -2 hours?
At EOBT -2 hours most flights will be known in the A-CDM platform, including if they are regulated or not. All regulated flights receive a CTOT from Network Manager OC. Timing. If the flight is regulated, a CTOT is issued at EOBT -2 hours.
How is TTOT calculated?
The TTOT is calculated automatically by the system in order to even out demand for runway capacity. Should a number of aircraft request runway capacity at the same time (TOBT + EXOT), the system will issue TSATs that are separated by a few minutes to ensure TTOTs are not clashing.
What is the purpose of the A-CDM document?
The purpose of this document is to describe the A-CDM system and procedures at Copenhagen Airport. The document is to be understood and used by the different partners, such as ground handling agents and airline
Who issues CTOT?
CTOT may be issued by the Network Manager at EUROCONTROL in case they need to regulate the demand to match the airspace and/or airport capacity. Regulated flights (flights with CTOT) will usually take priority over unregulated flights when calculating TSATs in order to minimize the potential CTOT delay.
What is A-CDM in aircraft?
The A-CDM process defines a set of milestones in the aircraft turn-round process, allowing all A-CDM partners to identify possible deviations from schedule. The A-CDM system tracks the progress of the turn-round process according to these milestones.
Does TOBT affect CTOT?
If an updated TOBT/E OBT is before or equal to the TSAT, changes in the TOBT/E OBT will in general not affect the CTOT. Only new restrictions en-route or at destination could trigger the issuing of a new CTOT.
What does AO stand for in aviation?
The time that an Aircraft Operator (AO) or Ground Handler (GH) estimates that an aircraft will be ready, all doors closed, boarding bridge removed, push back vehicle available and ready to start up / push back immediately upon reception of clearance from the Tower.
